MAIN arrow Workshop 03: New Features in 5.2
Details for Workshop 03: New Features in 5.2
PropertyValue
NameWorkshop 03: New Features in 5.2
Description

Workshop 3: New Features in 5.2

By Rick Geneva - Senior Process Expert, Intalio

1:00 PM - 2:30 PM
First day

Track:
Technical

Summary:
This session introduces the new features of Intalio|BPMS 5.2. It will provide hands on experience with the latest release and concrete examples of how to put the new features to work for you right away. One of the major features in 5.2 is Business Activity Monitoring (BAM) a component of BPM that adds a lot of value to process management. KPI (Key Performance Indicator) metrics are captured while a process is running and this information is displayed on a user configurable dashboard. BAM not only gives feedback on business metrics, but also helps to optimize process flows by exposing potential bottlenecks through reporting capabilities. With the 5.2 release of Intalio|BAM, we are in a leadership position in the area of BAM tools because of the ease of use, and the “dual capability” of our external variables system. Intalio|BAM is designed to not only report KPI metrics, but also to ease integration by allowing the Intalio process server to integrate with existing enterprise databases that are shared with other applications.

In this session there will be a discussion on identifying KPIs within a process, and a demonstration on how to quickly and easily implement these metrics in Intalio.

FilenameNew features in 5.2 - BAM.pdf
Filesize614.9 kB
Filetypepdf (Mime Type: application/pdf)
Creatorjonathan.crow
Created On: 06/23/2008 16:46
ViewersEverybody
Maintained byEditor
Hits542 Hits
Last updated on 06/23/2008 16:49
Homepage
CRC Checksum
MD5 Checksum